Bid More Projects.
Win More Work.
Analyze Blueprints
Drag & drop your PDFs or click to browse · Up to 5 files
One Subscription.
Run your whole operation on the Command subscription — billed monthly or yearly with no long-term lock-in.
No blueprint? No problem. A full, detailed written description of the job works just as well — the system builds your estimate straight from the scope of work.
Full 30-day money-back guarantee. Pay for your first month today. If BuildIG.ai isn't right for you, cancel within 30 days and we'll refund the full subscription fee — one click, no questions asked. Learn more
Essential GC
Solo estimators and small crews.
- ✓1 Essential GC license + unlimited free field users
- ✓5 Full Blueprint Analyses per month
- ✓Single-license plan — upgrade to add licenses
- ✓Unlimited marketplace posting & invites
- ✓Project management + scheduling
- ✓White-label documents with your logo
Advanced GC
Growing firms that bid weekly.
- ✓1 Advanced GC license + unlimited free field users
- ✓10 Full Blueprint Analyses per month
- ✓Add up to 3 extra licenses ($280 +10 / $440 +25 analyses)
- ✓Add a 5 or 10 analysis pack at checkout (from $110)
- ✓Advanced takeoffs & reporting
- ✓Unlimited marketplace posting & invites
- ✓White-label documents with your logo
Premium GC
High-volume operations.
- ✓1 Premium GC license + unlimited free field users
- ✓25 Full Blueprint Analyses per month
- ✓Add up to 10 extra licenses ($280 +10 / $440 +25 analyses)
- ✓Discounted analysis packs (5/$110, 10/$200, 25/$475, 50/$900)
- ✓Custom CSI divisions
- ✓White-label documents with your logo
- ✓24/7 priority support
Bidding subcontractors & vendors are always free · 30-day money-back guarantee · Cancel anytime
Posting and bidding are always free. We only earn on new introductions.
Listing, posting, and unlimited bidding are included in every plan. A one-time success fee applies only the first time the marketplace introduces you to a new GC — capped for your first 6 months, and every repeat job with that GC is always free.
Subcontractors & Trades
$2,500 cap · first 6 monthsWin work with a brand-new GC through the marketplace and pay a one-time 5% success fee on the awarded subcontract. For your first 6 months on BuildIG.ai it's protected by a $2,500 cap, no matter how big the job. It's charged only on your first award with that GC — repeat work, change orders, and unsuccessful bids are always free.
Vendors & Suppliers
$1,500 cap · first 6 monthsGet matched to a live bill of materials from a new GC and pay a one-time 2.5% success fee on the awarded order. For your first 6 months it's protected by a $1,500 cap. It's charged only on your first order with that GC — repeat orders and unsuccessful quotes are always free.
The 6-Month Rule
Caps protect you while you get started.
For your first 6 months the cap ($2,500 for trades, $1,500 for suppliers) shields you from large fees while you test the platform. After 6 months the cap lifts and platform-introduced awards move to the full, uncapped rate — by then you're winning consistent volume through the network.
Relationship Ledger
Existing relationships are always exempt.
Before every bid, the GC marks whether you're an existing relationship or a BuildIG.ai match. Relationships you already had off-platform incur zero fees indefinitely — success fees apply only to brand-new introductions the marketplace creates for you.
One-time · First new-GC award only · Capped first 6 months · No fee to GCs
How the marketplace and success fee work — in full
No hidden charges and no fine print. Posting and bidding are always free. Read the complete breakdown of who's on the marketplace, every trade and supply category we cover, and exactly when and how the capped success fee is applied.
The command center for your entire project
As a general contractor, you live in the gap between winning the work and delivering it on budget. BuildIG.ai closes that gap by turning drawings into structured quantities, pricing-ready bills of materials, and sequenced schedules — all from a single upload.
Instead of stitching estimates together across spreadsheets, email threads, and subs, you get one source of truth for scope, cost, and timeline that your whole team can build from.
- Full-project analysis across architectural, structural, and MEP
- Automated schedules and trade sequencing
- Vendor and subcontractor bid coordination
- Team collaboration with shared BOQs and reports
Watch the AI read your full plan set.
BuildIG.ai's computer-vision engine scans every sheet the way a senior estimator would — identifying walls, openings, and assemblies, then measuring each one to build a structured, traceable takeoff.
- Reading drawing set…
- Detecting walls & openings…
- Measuring areas and lengths…
- Classifying materials…
- Generating Bill of Quantities…

From plan set to submitted bid in 4 steps
A workflow built for the volume and complexity general contractors deal with every week.
See how it fits your workflow — book a live demo.
Book a DemoOne workflow, from ground-break to closeout.
BuildIG.ai manages the entire construction lifecycle — every phase connected in a single intelligent platform. Select a step to see how it works.
Step 1 of 10
Initiation
Kick off a new project.
Start by defining the client, project name, location, and basic parameters. BuildIG.ai uses your location to tailor material pricing, labor rates, and code compliance to your specific region from day one.
The 6-step professional estimating flow
From the first project parameter to a client-ready quote, the Professional Estimator workbench keeps every number auditable and every euro accounted for.
Run every job from one workspace
Once your estimate is approved, it flows straight into project management. Nine connected modules keep estimating, scheduling, billing, and your crew coordinated from a single command center.
Home
The welcome dashboard — your command center for every active job.
My Projects
The full project portfolio matrix, tracked in one view.
Jobs Calendar
The master scheduling timeline across every project.
Quotes & Invoices
The global financial ledger for bids and billing.
Marketplace
The sourcing and bidding ecosystem for subs and suppliers.
Connections
Your user directory and professional network.
Notifications
Centralized system alerts, bids, and timeline changes.
Archive
Data retention and recovery for completed jobs.
Settings
Account, compliance, and UI configuration.
Mason — your AI assistant
A persistent chat bubble sits in the corner of every screen. Open Mason to ask operational questions, re-run blueprint calculations, or instruct the AI — all without leaving your work. A running execution history lets you jump back into any past analysis or conversation.
Distraction-free by design
A smart, auto-collapsing sidebar keeps the workspace uncluttered — hover the edge to reveal the full menu, and it slides away when you get back to work. A persistent header keeps support, notifications, and account settings one click away on every page.
Everything a GC needs to price and run the job
Estimation and project management working from the same data set.
Full-Project Takeoffs
Complete material quantities across every discipline in one pass, not trade-by-trade guesswork.
Automated Scheduling
Generate trade sequencing and project timelines that update as scope changes.
Sub Bid Management
Split scope by trade, send invitations, and compare incoming sub bids side by side.
Regional Pricing
Material and labor pricing localized to your market so bids reflect real costs.
Team Collaboration
Shared projects, roles, and standardized reports keep estimators and PMs aligned.
Change Tracking
See how revisions ripple through quantities, cost, and timeline instantly.
Not sure where to start? Upload a plan and see it analyzed.
No Drawings? No Problem. No Excuses.
Full blueprints, trade-specific sheets, or just a job description. BuildIG.ai delivers automated quantity takeoffs and complete construction BOQs however your project starts.
Upload complete architectural and engineering drawings, and BuildIG.ai will analyze the entire project — generating quantities, materials, timelines, and cost intelligence across all trades.
How It Works
Our AI scans every sheet of your blueprints, identifying structural elements, MEP systems, finishes, and site work. It cross-references specifications with regional pricing data to deliver comprehensive takeoffs.
Key Features
Best For
- Large commercial projects
- Multi-family residential
- New construction
- Projects requiring full scope analysis
Output Includes
- Complete BOQ across all trades
- Material quantities with waste factors
- Labor hour estimates
- Cost projections with regional adjustments
- Project timeline suggestions
Only working on a specific scope? No problem. BuildIG.ai includes selective analyzers designed specifically for individual trades, delivering accurate quantities without the noise of a full project analysis.
How It Works
Select your trade specialty, upload relevant drawings, and our AI focuses exclusively on extracting quantities and specifications for that scope. No distractions from other trades.
Key Features
Available Trade Modules
Best For
- Subcontractors bidding specific scopes
- Trade-specific renovations
- Specialty contractors
- Quick trade estimates
Output Includes
- Trade-specific material lists
- Fixture and equipment counts
- Labor estimates for scope
- Code compliance checks
- Specification matching
Not every job starts with drawings. Simply provide a detailed job description, scope of work, or specifications — and BuildIG.ai will generate its best-possible estimate based on construction intelligence and regional data.
How It Works
Describe your project in detail — dimensions, materials, scope of work, location. Our AI leverages millions of data points from similar projects to generate realistic estimates and material lists.
Key Features
Best For
- Early-stage budgeting
- Renovation projects
- Small works & repairs
- Feasibility studies
- Quick client quotes
Output Includes
- Estimated material quantities
- Rough cost projections
- Suggested specifications
- Timeline estimates
- Risk factors to consider
Click on any analysis mode above to learn more about its capabilities.
Bid Faster. Build Smarter. Win More.
Two powerful modules that replace five tools. Zero learning curve, maximum impact.
Which Side Are You On?
BuildIG.ai connects estimating and project management into one intelligent ecosystem. Start on either side — most teams use both.
Estimate
Estimator · Pay-per-use
- ✓Upload blueprints
- ✓Generate takeoffs
- ✓Create Bills of Materials
- ✓Produce quotations
- ✓Cost forecasting
- ✓Procurement planning
- ✓Concept pricing
AI Project Management
Command · Subscription
- ✓Manage live projects
- ✓Track schedules
- ✓Monitor budgets
- ✓Coordinate teams
- ✓Daily reporting
- ✓RFIs & change orders
- ✓Complete project lifecycle
Sketch to Blueprint
Have a hand sketch or concept drawing? Upload it and let BuildIG.ai convert it into a digital blueprint that's ready for AI-powered estimating. Perfect for early budgeting, feasibility studies, and pre-construction planning.
Don't Take Our Word For It. Verify It.
99.5% accuracy on all materials, verified by Senior Quantity Surveyors. Every number is traceable, reviewable, and built on real construction logic.
Verified by Senior Quantity Surveyors
From upload to complete BOQ
Compared to manual takeoffs
A construction family that learned to code.
BuildIG.ai comes from a family with generations in the construction industry, so the logic is built on how jobs are actually won and lost, not guesswork. Our dedicated engineering and QA teams refine the estimating engine continuously alongside veteran Quantity Surveyors, and every release is stress-tested against real-world takeoffs before it ships.
Commercially launched April 2026
Live and pricing real projects around the world.
Exhibiting at the Austin Build Expo
Meet the team on the show floor.
Backed by committed equity partners
Funded to build for the long haul.
"We used to spend 3 days on a single takeoff. BuildIG.ai does it in under 15 minutes with accuracy we can actually verify."
James T.
Senior Quantity Surveyor · United Kingdom
"The difference is night and day. We went from submitting 4 bids a month to 12. That alone paid for the platform in the first week."
Carlos M.
General Contractor · Texas, USA
"As a project manager, having the materials list and timeline before breaking ground changed how I plan every project."
Sarah K.
Project Manager · Sydney, Australia
"I was skeptical about AI doing takeoffs. The 99.5% accuracy claim checked out. I verified it line by line on a commercial project."
David R.
Estimator · California, USA
General Contractor FAQ
What GCs ask most before rolling BuildIG.ai out across their team.
Can BuildIG.ai handle a full multi-discipline plan set?
How does the scheduling feature work?
Can I invite my subcontractors to bid?
Does it integrate with our estimating software?
How many people can collaborate on a project?
What if it doesn't work for me?
Ready to win more bids? Get started today.
AI Blueprint Analysis & Automated Quantity Takeoff FAQ
Everything contractors need to know about AI-driven construction estimating
How does AI improve takeoff accuracy?
What file formats are supported for automated quantity takeoffs?
How long does an automated quantity takeoff take?
Is my blueprint data secure?
Can I export the AI-generated BOQ to my existing estimating software?
How does the AI-driven construction BOQ differ from manual takeoffs?
Does BuildIG.ai work for subcontractors bidding on specific trades?
What if I don't have blueprints — just a job description?
How much does BuildIG.ai cost?
Does BuildIG.ai handle global standards?
Every Manual Takeoff
Costs You a Bid.
Construction firms in your area are saving 80+ hours per bid and winning 3x more projects.
While you spend 3 days on a takeoff, your competitor submits in 15 minutes. The cost of inaction is measured in lost contracts.